Rigid Polyurethane (PU) Foam Spray
- 2002 Hospital Serdang, Selangor D.E. 10,000 m2
- 2003 Hospital Sungai Buloh, Kuala Lumpur 13,290 m2
- 2003 Hospital Sungai Petani, Kedah D.A 15,579 m2
- 2004 Sarawak General Hospital, Kuching, Sarawak 6,000 m2
- 2005 Sarawak International Medical Centre, Kuching 15,000 m2
- 2006 Hospital Angkatan Tentera Tuanku Mizan, KL 20,979 m2
- 2007 Institut Jantung Negara, Kuala Lumpur 9,122 m2
- 2008 Hospital Tawakal 400 m2
- 2009 UiTM Faculty of Medicine, Sungai Buloh, K.L 10,368 m2
- 2009 USM, Institut Perubatan & Pergigian, Bertam 5,000 m2
- 2010 Hospital Ampang, Kuala Lumpur 1,440 m2
- 2010 Hospital Tuanku Jaafar, Seremban 15,913 m2
- 2011 Hospital Raja Perempuan Zainab II, Kota Bahru 20,540 m2
- 2011 Institut Kanser Negara, Putrajaya 72,000 m2
- 2012 Hospital Shah Alam 74,960.53 m2
- 2012 Hospital Tuanku Fauziah, Perlis 21,289.76 m2
- 2014 Hospital Gleneagle, Kuala Lumpur 9,648 m2
- 2014 Hospital Jeli, Kelantan 2,407 m2
- 2014 Malaysia Institut of Aviation Technology, Subang 2,395m2
- 2015 PPUM, Kuala Lumpur 11,966 m2
- 2016 Bank Negara Malaysia’s Business Operation Complex, Shah Alam, Selangor 10,000 m2
Cavity Wall Insulation
- 2003 Hospital Termeloh , Pahang 3,582 m2
- 2003 Hospital Kunak, Sabah 1,211 m2
- 2003 Hospital Sarikei, Sarawak 3,253 m2
- 2004 Sarawak General Hospital, Kuching, Sarawak 3,280 m2
- 2005 Sarawak International Medical Centre, Kuching 5,533 m2
- 2005 Sarawak International Medical Centre, Kuching 5,533 m2
- 2009 USM, Institut Perubatan & Pergigian, Bertam 3,000 m2
- 2011 Institut Kanser Negara, Putrajaya 9,000 m2
- 2012 Hospital Shah Alam 17,389 m2
- 2012 Hospital Tuanku Fauziah, Perlis 14,200 m2
Piping, Equipment and Tank Insulation
- 2001 Universiti Teknologi Petronas District Cooling Plant, Tronoh, Perak
- 2002650 MW Combined Cycle Power Plant, Perlis
- 2002 Chilled Water Distribution Piping, Putrajaya Precint 2.
- 2003 Chilled Water Distribution Piping, Putrajaya Precint 3 & 4
- 2004 Convention Centre Chilled Water Plant, Putrajaya
- 2006 Palm Tocotriencol Plant, Teluk Panglima Garang
- 2008 Chilled Water Tank, CSF Data Centre, Cyberjaya
- 2008 Seafrigo, Pulau Indah
- 2008 Chiller Insulation, District Cooling Plant, Precint 1 & 5
- 2012 Chiller Water Tank, Universiti Darul Iman, Terengganu
- 2012 Chilled Water Plant, Infeon, Kulim
Piping & Equipment Installation
- 2005 Chilled Water Distribution Piping , AIMST Univercity, Kedah
- 2007 Chilled Water Plant, Prince Court Hospital, Kuala Lumpur
- 2007 Chilled Water Distribution Piping , Mas Hanger A380, Sepang
- 2007 Prefabricated Hot Water Distribution Piping, Japan
- 2009 Chilled Water Plant Extension, UNIMAS, Kuching, Sarawak
- 2010 Chilled Water System, Four By Sheraton, Langkawi, Kedah
- 2012 AML Manganese Smelter Plant, Bintulu, Sarawak
- 2014 Chilled Water System, Molecor Factory, Gebeng, Pahang
- 2016 Bath Tank System, Molecor Factory, Gebeng, Pahang
Insulated (Sandwich) Panel and Refrigeration System Installation
- 2009 FAMA, Sepang
- 2009 Makmal Kesihatan Awam, Kota Bahru, Kelantan
- 2011 RTM Angkasapuri, Kuala Lumpur
- 2011 Klink Kesihatan Jenis 2, Cheras, Kuala Lumpur
- 2013 Klink Kesihatan Jenis 2, Putrajaya